U.S. Solar Energy Co.
Millersville, MD · 2025

Pilot installed. Six more ordered.

A single All Seasons pole was installed at an Anne Arundel County site to demonstrate combined lighting and surveillance performance.

  • PILOT · 2025
  • 6 MORE ORDERED

A single All Seasons pole was installed at an Anne Arundel County site to demonstrate combined lighting and surveillance performance.

Full install brief coming soon. Additional performance data and site context are being compiled with the property owner.

Install brief draft · expanded detail being compiled

Get a project like this on your site.

Request a Quote
  • ·157 MPH Wind Tunnel Tested
  • ·Stamped EPA Engineering Documentation
  • ·8-Year Limited Warranty
  • ·Assembled in America, ITC Eligible
  • ·24/7 Online Monitoring & Alerts